Grader made contact with shallow buried power line
Click to enlarge

Grader made contact with shallow buried power line

$0.00
As a grader attempted to fix the ruts to the entrance of a work site, the grader blade made contact with a live underground power line buried 1-3 inches below the surface of the road.